Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Cattell, D W, Bowen, P A and Kaka, A P (2011) Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model. Journal of Construction Engineering and Management, 137(12), 1052–9.

Cheung, S O and Chow, P T (2011) Withdrawal in Construction Project Dispute Negotiation. Journal of Construction Engineering and Management, 137(12), 1071–9.

Edwards, D J and Holt, G D (2011) Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture. Journal of Construction Engineering and Management, 137(12), 1125–33.

Eybpoosh, M, Dikmen, I and Talat Birgonul, M (2011) Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 137(12), 1164–75.

Fonte, G C A (2011) Energy Management Reduces Great Pyramid Build Effort by More Than 98%. Journal of Construction Engineering and Management, 137(12), 1195–204.

Golparvar-Fard, M, Peña-Mora, F and Savarese, S (2011) . Journal of Construction Engineering and Management, 137(12), 1099–116.

Gouett, M C, Haas, C T, Goodrum, P M and Caldas, C H (2011) Activity Analysis for Direct-Work Rate Improvement in Construction. Journal of Construction Engineering and Management, 137(12), 1117–24.

Hartmann, T (2011) Goal and Process Alignment during the Implementation of Decision Support Systems by Project Teams. Journal of Construction Engineering and Management, 137(12), 1134–41.

Heon Jun, D and El-Rayes, K (2011) Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling. Journal of Construction Engineering and Management, 137(12), 1080–8.

Kale, S and Karaman, E A (2011) Evaluating the Knowledge Management Practices of Construction Firms by Using Importance–Comparative Performance Analysis Maps. Journal of Construction Engineering and Management, 137(12), 1142–52.

Kirgiz, M S (2011) Chemical Properties of Blended Cement Pastes. Journal of Construction Engineering and Management, 137(12), 1036–42.

Li, J and Zou, P X W (2011) Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. Journal of Construction Engineering and Management, 137(12), 1205–9.

Li, N and Becerik-Gerber, B (2011) Life-Cycle Approach for Implementing RFID Technology in Construction: Learning from Academic and Industry Use Cases. Journal of Construction Engineering and Management, 137(12), 1089–98.

Li, Y Y, Chen, P, Chew, D A S, Teo, C C and Ding, R G (2011) Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore. Journal of Construction Engineering and Management, 137(12), 1153–63.

Love, P E D, Edwards, D J, Irani, Z and Goh, Y M (2011) Dynamics of Rework in Complex Offshore Hydrocarbon Projects. Journal of Construction Engineering and Management, 137(12), 1060–70.

Nahmens, I and Bindroo, V (2011) Is Customization Fruitful in Industrialized Homebuilding Industry?. Journal of Construction Engineering and Management, 137(12), 1027–35.

Swarup, L, Korkmaz, S and Riley, D (2011) Project Delivery Metrics for Sustainable, High-Performance Buildings. Journal of Construction Engineering and Management, 137(12), 1043–51.

Xia, B, Chan, A P C and Yeung, J F Y (2011) Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations. Journal of Construction Engineering and Management, 137(12), 1176–84.

  • Type: Journal Article
  • Keywords: Design/build; Decision making; China; Fuzzy sets; Construction industry; Design-build; Fuzzy set; Multicriteria decision-making; China;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000381
  • Abstract:
    Many academic researchers have conducted studies on the selection of a design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which pose challenges to many clients. The selection of a DB operational variation is a multicriteria decision-making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. To resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely, the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted-mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Zhou, H and Zhang, H (2011) Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China. Journal of Construction Engineering and Management, 137(12), 1185–94.